Hazards Green Pipeline – East Sussex
Job Title
Hazards Green Pipeline
Client
South East Water
Description
The works comprised of the installation of approximately 4km of 450 diameter ductile iron pipeline between Hazards Green Water Treatment Works and Windmill Hill to replace the 9” cast iron main between Boreham Street and Windmill Hill, and the 10” cast iron main between Hazards Green Water Treatment Works and Boreham Street.
Additional reinforcement works were undertaken on a 450m, 300mm diameter pipe laid parallel to the existing ductile iron.
Duration
12 Weeks