We have recently completed the reinstatement of Forest Row Bridleway 2F on behalf of East Sussex County Council. The bridle way connects Hammerwood to Forest Row and passes through Wetwood, which as the name suggests gets very boggy throughout the winter.
Work included skimming off the top layer of mud and leaves and then laying down a hardcore base with type 1 limestone over the top. We then cleared out some of the existing ditches and installed some new cross drainage which will help keep the bridleway drier and allow much better use of the bridle way throughout the year.
A great job by Rob, Steve and Richard.