Brighton Marina Cliff Bank Stabilisation

Project Info

  • Project Value

    £360,000

  • Category

    Coastal & River

Job Title

Brighton Marina Cliff Bank Stabilisation

Client

Brighton & Hove City Council

Description

Re-profiling the top third of the cliff face using a long reach excavator and retaining the lower section using soil nailing techniques.

Chalk from the excavation work was distributed on the beach as a further erosion control measure.

Duration

12 Weeks