Groombridge Water Treatment Works
Job Title
Groombridge Water Treatment Works / Groombridge to Langton Pipeline
Client
South East Water
Description
Works entailed an upgrade of the existing Langton pumps including the installation of a flow meter, new pumps, modifications to the existing contact tanks and refurbishment of the lagoons, combined with the laying of 3.75km of 300mm diameter ductile iron pipe to link to Langton Reservoir.
Duration
24 Weeks